Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Murakami, Hiroaki; Nishiyama, Nariaki; Takeuchi, Ryuji; Iwatsuki, Teruki
Oyo Chishitsu, 64(2), p.60 - 69, 2023/06
In order to confirm the quality control items for borehole closure in radioactive waste disposal projects, in-situ borehole sealing tests using bentonite material were conducted. As a result, the closure performance was successfully demonstrated by comparing the data of water injection tests conducted before and after the installation of the closure material. However, the breakthrough was observed after closing, probably due to high differential pressure applied to the seal section. Thus, it is important to ascertain throughout the entire operation that the borehole is adequately closed. The placement and specifications of the closure material should be determined according to the hydrogeological structure in the borehole. The confirmation items to use bentonite for sealing material are identified to be: to consider swelling and density loss in the borehole; to place the planned depth using appropriate emplacement technique; to be placed without damage to seals when use some backfilling materials, considering effect of permeability on adjacent seals.
Murakami, Hiroaki; Iwatsuki, Teruki; Takeuchi, Ryuji; Nishiyama, Nariaki*
Genshiryoku Bakkuendo Kenkyu (CD-ROM), 27(1), p.22 - 33, 2020/06
Geological disposal of radioactive waste requires the large amounts of fundamental technical knowledge throughout the project. Monitoring is carried out to collect site-relevant information for the creation of an environmental database, to assist in the decision-making process, etc. We summarized the current technical level and problems of the groundwater monitoring in the world. Through the research and technology development so far, the technologies have been developed for drilling borehole in the geological environment survey prior to monitoring and the selection of the monitoring site. However, the following technical developments are remaining issues: long-term operation method of monitoring equipment, retrieving method of monitoring equipment after long-term operation, transport method of backfill material for borehole sealing, technical basis for the sealing performance when the borehole-protective casing and strainer tube are left.
Murakami, Hiroaki; Iwatsuki, Teruki; Takeuchi, Ryuji; Maeda, Toshikatsu
no journal, ,
no abstracts in English
Murakami, Hiroaki; Nishiyama, Nariaki*; Iwatsuki, Teruki; Takeuchi, Ryuji
no journal, ,
no abstracts in English
Murakami, Hiroaki; Nishiyama, Nariaki*; Iwatsuki, Teruki; Takeuchi, Ryuji
no journal, ,
no abstracts in English
Nishiyama, Nariaki*; Takeuchi, Ryuji; Iwatsuki, Teruki; Murakami, Hiroaki
no journal, ,
no abstracts in English